Part A — Temporary and Transient Overvoltages at a Glance
Every piece of high-voltage equipment on a transmission system, distribution system or inverter-based plant is designed around one question: what is the highest voltage it will ever see, and for how long? The answer is never simply the nameplate voltage. During a ground fault, the unfaulted phases rise. When a long line is opened at one end, its far end climbs above the sending-end voltage. When a breaker closes a line or a capacitor bank, a surge travels down the conductors and reflects back with nearly twice its starting amplitude. When lightning strikes a shield wire, a voltage of several million volts can appear across an insulator string for a few microseconds.
These events fall into two families that engineers must treat very differently. Temporary overvoltages (TOVs) are oscillatory, at or near power frequency, and last from a few cycles to many seconds. Transient overvoltages are short, highly damped or unidirectional surges that last from fractions of a microsecond to a few milliseconds. A TOV is judged by its RMS magnitude and its duration. A transient is judged by its crest value and its wave shape: how fast it rises, how long it lasts, and how often it repeats.
The distinction is not academic. A surge arrester that easily absorbs a 3 pu switching surge can be destroyed in a few seconds by a 1.5 pu TOV, because the arrester conducts heavily for every cycle of the TOV and heats up. A transformer whose basic lightning impulse insulation level (BIL) is more than adequate for lightning can still be damaged by a long, low-level resonant overvoltage that drives it into saturation. And the mitigation tools are different: pre-insertion resistors and controlled (point-on-wave) switching mainly tame switching transients, while grounding design, reactive compensation, protection speed and control logic set the TOV.
This guide explains both families from the perspective of insulation coordination: what causes each overvoltage, how to calculate or simulate it, how equipment ratings are matched to it, which IEEE standards apply, and how to document a defensible study. It also explains a link that is often missed: the out-of-step tripping and power swing decisions governed by NERC PRC-026 determine when transmission breakers open at large angles, which sets the most severe voltages their contacts ever see and can leave islands exposed to load-rejection TOV.
Related Keentel reading. Our guide on post-fault overvoltage in weak grids (When LVRT Becomes HVRT) covers inverter control behavior after fault clearing. Our Ferranti effect guide covers light-load voltage rise on long lines. Our harmonic resonance guide covers resonance in collector systems. Our power swing and NERC PRC-026 guide covers Attachment B evaluations and out-of-step tripping in depth. This article ties those topics together through insulation coordination.
Who this guide is for
- Substation and transmission line design engineers who select BIL, switching impulse levels, clearances and surge arresters for 69 kV through 765 kV facilities.
- Protection and planning engineers who decide where out-of-step tripping is applied, how fast faults are cleared and how islands form, and who must defend those decisions under NERC PRC-026, PRC-024, PRC-029 and TPL-001.
- Inverter-based resource owners and owner's engineers for solar, wind and battery plants with 34.5 kV collectors and 115 kV to 500 kV points of interconnection, where grounding, cable capacitance and inverter behavior drive TOV.
- Utility capacitor bank and reactor owners who must manage energization transients, back-to-back inrush and voltage magnification at customer facilities.
- EMT study engineers who need a clear, defensible methodology for switching, lightning and TOV studies in PSCAD and similar tools.
The core ideas in one table
| Topic | Temporary overvoltage (TOV) | Transient overvoltage |
|---|---|---|
| Definition (IEEE practice) | Oscillatory overvoltage of relatively long duration, undamped or weakly damped, at or near power frequency; may include resonant harmonic frequencies | Short-duration overvoltage of a few milliseconds or less, oscillatory or unidirectional, usually highly damped |
| Typical duration | Several cycles to tens of seconds; continuous in some resonance and Ferranti cases | Tens of nanoseconds to a few milliseconds |
| Sub-classes | Ground-fault, load-rejection, Ferranti, resonance and ferroresonance, harmonic (transformer energization), islanding | Very-fast-front (under 0.1 µs), fast-front (0.1–20 µs, lightning), slow-front (20–5,000 µs, switching) |
| Typical magnitude | 1.1–1.5 pu on effectively grounded systems; up to 1.73 pu or more on ungrounded or resonant systems | Switching: 1.5–3.0 pu crest; lightning: limited only by flashover or arresters |
| What matters | RMS magnitude and duration; how often it occurs | Crest magnitude, front time, tail time, energy, rate of rise |
| Equipment stressed | Arresters (thermal), transformers (overexcitation), capacitors, inverters, cable accessories | Insulation (BIL and switching impulse level), arresters (energy), breakers (TRV), transformer windings (steep fronts) |
| Test and rating basis | Arrester TOV capability curve; power-frequency withstand; transformer and capacitor short-time ratings | Lightning impulse (1.2/50 µs) and switching impulse (250/2,500 µs) withstand; arrester protective levels |
| Main mitigations | Effective grounding, fast clearing, shunt reactors, control logic, avoiding resonance, intertripping and island detection | Arresters, pre-insertion resistors, controlled switching, shield wires, low footing resistance, line arresters, surge capacitors |
| Study tools | Short-circuit and sequence calculations, RMS dynamics, EMT for resonance and IBR control | EMT with frequency-dependent line models, statistical switching, lightning models |
Fact check: what simple explanations get right and wrong
Short descriptions of TOV and transient overvoltage are usually correct in outline but miss details that matter in design. The table below gives Keentel's assessment of statements we often see in training material, study scopes and presentations.
| Common statement | Keentel assessment |
|---|---|
| "A TOV is a sustained, near power-frequency voltage rise." | Mostly right. IEEE practice defines TOV as an oscillatory overvoltage of relatively long duration that is undamped or only weakly damped. It is usually at power frequency, but resonant TOVs can be at harmonic frequencies, for example the 2nd to 5th harmonics produced by transformer energization in a resonant network. A harmonic TOV can be more damaging than its RMS value suggests. |
| "TOV lasts cycles to seconds or longer." | Right, with an important extension. Ground-fault TOV lasts only until the fault is cleared, often 3–6 cycles on transmission systems, but backup clearing can stretch it to a second or more. Load-rejection TOV can last seconds until regulators act. Ferranti rise and some ferroresonance can persist indefinitely until someone switches equipment. Arrester and transformer ratings must cover the longest credible duration, not the typical one. |
| "Typical TOV causes are earth faults, load rejection and resonance." | Correct but incomplete. In US terms these are ground faults, load rejection and resonance (including ferroresonance). Add the Ferranti effect on lightly loaded lines, harmonic overvoltage from transformer energization, islanding of inverter-based plants and cable-connected networks, and loss of a system ground source on collector systems. |
| "Transients last microseconds to milliseconds." | Correct. Standard practice classifies transients by front time: very-fast-front (under 0.1 µs, typically gas-insulated switchgear disconnect switching), fast-front (0.1 to 20 µs, typically lightning) and slow-front (20 to 5,000 µs, typically switching). The class sets which insulation withstand applies. |
| "Transient causes are lightning, line energization and capacitor switching." | Correct but incomplete. Add line reclosing with trapped charge, fault initiation and clearing, back-to-back capacitor switching, restrikes when de-energizing capacitors or cables, shunt reactor de-energization (current chopping), transformer switching, transient recovery voltage across breaker contacts and very-fast transients in GIS. |
| "For TOV, monitor RMS voltage and duration; for transients, monitor peak voltage, wavefront and arrester energy." | Right, and both lists should be longer. For TOV, also monitor arrester energy and temperature-relevant duration, transformer flux (overexcitation) and harmonic content. For transients, also monitor breaker TRV and rate of rise of recovery voltage, voltage at equipment terminals rather than only at the arrester, and statistical distributions rather than single cases. |
| "Pre-insertion resistors and point-on-wave control mainly address switching transients." | Correct as a statement of purpose. They are switching-transient tools and do little for ground-fault or Ferranti TOV. Controlled switching of transformers, however, also reduces inrush and therefore the harmonic TOV that inrush can excite in a resonant network. |
| "Time ranges are indicative; classification depends on wave shape and frequency." | Correct and important. Insulation strength depends on the wave shape actually applied. A switching surge with a 250 µs front stresses air gaps far more severely per kilovolt than a 1.2 µs lightning impulse, which is why extra-high-voltage line design at 345 kV and above is usually governed by switching surges, not lightning. |
| "Arresters protect against all overvoltages." | No. Metal-oxide arresters clip transients to their protective level. They cannot limit a TOV below their own TOV capability without failing. A TOV must be kept below the arrester's capability curve by design; the arrester is then chosen to survive it. |
Eight findings for decision makers
1. TOV sets the arrester; transients set the insulation. The arrester's maximum continuous operating voltage (MCOV) and TOV capability are chosen from the TOV study. Its protective level then determines the insulation margin for lightning and switching surges. Getting the TOV wrong forces either an arrester that fails or an arrester rated so high that the insulation margin disappears.
2. Grounding is the first TOV decision. On an effectively grounded system the unfaulted phases rise to about 1.25 to 1.35 pu during a ground fault. On a system that loses its ground source, they approach 1.73 pu. In our 138 kV example, the same 84 kV MCOV arrester is safe in the first case and fails within about a second in the second.
3. Duration matters as much as magnitude. An arrester that withstands 1.40 times MCOV for 1 second may withstand only about 1.30 times for 10 seconds. Backup clearing times and regulator response times belong in every TOV study.
4. Switching surges govern line design at 345 kV and above. On our 500 kV example, a 2.8 pu statistical switching overvoltage without mitigation calls for a phase-to-tower gap of about 15 ft. Pre-insertion resistors cut it to about 8 ft; controlled closing with arresters cuts it further. That is the difference between tower designs.
5. Lightning performance is set by footing resistance. On our 138 kV example, raising tower footing resistance from 10 to 50 ohms raises the share of strokes to a tower that can cause a backflash from about 4% to about 66%.
6. Capacitor switching reaches beyond the substation. Energizing a 50 Mvar, 138 kV bank produces a transient near 650 Hz. A customer with a 13.8 kV power factor correction bank tuned near that frequency can see voltage magnification that trips adjustable-speed drives, even though the utility's own equipment is unaffected.
7. Out-of-step decisions set breaker voltage stress. Opening a 345 kV breaker at a 180° angle between systems puts about 2.0 to 2.1 pu across its contacts. NERC PRC-026 work, out-of-step tripping philosophy and breaker out-of-phase ratings must be checked together.
8. IBR plants need their own overvoltage study. Cable capacitance, harmonic filters, collector grounding and inverter control can create TOVs that no transmission study will reveal. Islanded collector feeders and post-fault reactive current are the usual culprits.
Key terms
| Term | Meaning |
|---|---|
| Per unit (pu) overvoltage | For TOV, usually the RMS line-to-ground voltage divided by the maximum continuous line-to-ground voltage. For transients, usually the crest line-to-ground voltage divided by the crest of the maximum line-to-ground voltage. Always state the base. |
| Maximum system voltage | The highest continuous operating voltage for which equipment is designed, for example 145 kV for a 138 kV system, 242 kV for 230 kV, 362 kV for 345 kV, 550 kV for 500 kV and 800 kV for 765 kV. |
| BIL | Basic lightning impulse insulation level: the crest of a standard 1.2/50 µs impulse that insulation must withstand. |
| BSL | Basic switching impulse insulation level: the crest of a standard 250/2,500 µs switching impulse that insulation must withstand; specified for equipment at 345 kV and above and often stated for lower voltages. |
| CFO | Critical flashover voltage: the impulse crest at which self-restoring insulation (air, porcelain) flashes over 50% of the time. Withstand is set statistically below the CFO. |
| MCOV | Maximum continuous operating voltage of a surge arrester: the RMS voltage it can carry indefinitely. |
| TOV capability | The curve of RMS voltage versus duration that an arrester can carry after a defined energy absorption without thermal runaway. |
| LPL and SIPL | Lightning impulse protective level and switching impulse protective level: the arrester residual voltages at stated lightning and switching discharge currents. |
| Protective margin | The percentage by which insulation withstand exceeds the voltage that reaches it. |
| Coefficient of grounding (COG) | The highest unfaulted-phase voltage during a ground fault, as a percentage of normal phase-to-phase voltage. |
| Effectively grounded | A system where X0/X1 is positive and no greater than 3 and R0/X1 is positive and no greater than 1, which keeps COG at or below about 80%. |
| E2 | The statistical switching overvoltage with a 2% probability of being exceeded, obtained from a statistical switching study. |
| PIR | Pre-insertion (closing) resistor: a resistor inserted for several milliseconds before the main contacts close, to damp switching surges. |
| Controlled switching | Point-on-wave closing or opening timed to a chosen point of the voltage or current wave, used to reduce switching transients and inrush. |
| TRV | Transient recovery voltage: the voltage that appears across breaker contacts immediately after current interruption. |
| Ferroresonance | A nonlinear resonance between system capacitance and a saturable iron-core inductance that can produce sustained, distorted overvoltages. |
Part B — Engineering Guide to Temporary and Transient Overvoltages
1. Insulation coordination: the framework behind every overvoltage study
Insulation coordination is the process of selecting the dielectric strength of equipment and the characteristics of protective devices so that the probability of insulation failure is acceptably low and economically justified. In US practice the governing documents are IEEE Std C62.82.1 (insulation coordination definitions, principles and rules), the companion IEEE application guide for insulation coordination (historically IEEE Std 1313.2), IEEE Std C62.22 (application of metal-oxide surge arresters), IEEE Std C62.11 (metal-oxide arrester performance and testing), IEEE Std 4 (high-voltage test techniques) and IEEE Std C57.12.00 (general requirements for liquid-immersed transformers, including insulation levels).
The process has four steps, and every overvoltage study should be able to show where it sits within them.
| Step | Question | Typical inputs | Typical outputs |
|---|---|---|---|
| 1. Determine representative overvoltages | What voltages, of what shapes, durations and probabilities, will the equipment see? | System grounding, short-circuit data, line and cable parameters, switching devices, lightning data | TOV magnitudes and durations; statistical switching surge distributions; lightning surge parameters |
| 2. Select protection | Which arresters, gaps, resistors, controlled switching or shielding will limit those voltages? | Step 1 results, equipment locations | Arrester MCOV, TOV capability, energy class, location; switching mitigation |
| 3. Determine required withstand | What insulation strength is needed, after protection, with margin? | Protective levels, separation distances, statistical safety factors, altitude | Required lightning and switching withstand voltages |
| 4. Select standard levels | Which standard BIL, BSL and clearance meet the requirement? | Standard insulation tables, equipment availability | Specified BIL, BSL, phase-to-ground and phase-to-phase clearances |
TOV and transient studies feed different steps. The TOV study mainly drives step 2 (arrester rating) and the continuous and short-time ratings of transformers, capacitors and inverters. The transient studies drive steps 1, 3 and 4. A good study report keeps the two families separate, because they use different bases, different models and different acceptance criteria.
| Subject | Primary US references |
|---|---|
| Definitions, principles and insulation levels | IEEE C62.82.1; IEEE insulation coordination application guide (1313.2 series) |
| Arrester application and ratings | IEEE C62.22; IEEE C62.11 |
| System grounding and coefficient of grounding | IEEE C62.92 series (neutral grounding in electrical utility systems) |
| Transformer insulation and overexcitation | IEEE C57.12.00; IEEE C57.12.90 (tests) |
| High-voltage test wave shapes | IEEE Std 4 |
| Lightning performance of lines | IEEE Std 1243 (transmission), IEEE Std 1410 (distribution) |
| Direct-stroke shielding of substations | IEEE Std 998 |
| Shunt capacitor application | IEEE Std 1036; IEEE Std 18 (shunt power capacitors) |
| Breaker capacitance switching and TRV | IEEE C37.04, C37.06, C37.09, C37.011 and C37.012 |
| Overhead line and station clearances | NESC (ANSI C2), Sections 12, 23 and 44; IEEE Std 1427 (electrical clearances in substations); IEEE Std 516 (minimum approach distances for live work) |
| Inverter-based resource performance | IEEE Std 2800 (transmission-connected IBRs); IEEE Std 1547 (distributed energy resources) |
| Reliability standards that set fault clearing, ride-through and swing behavior | NERC TPL-001, PRC-024, PRC-029, PRC-026, PRC-023, FAC-001 and FAC-002 |
Editions change. A design basis memorandum should list the edition of each document used and should be updated when the owner adopts a new edition.
How Keentel Engineering helps here. Keentel prepares insulation coordination design basis memoranda for substations, transmission lines and inverter-based plants from 4 kV to 765 kV. We define the overvoltage study cases, the protective device strategy and the acceptance criteria up front, so that arrester selection, BIL specification and clearances are traceable to documented study results rather than rules of thumb.
2. Classifying overvoltages by shape and duration
The classes used in insulation coordination are defined by shape and duration because insulation strength depends strongly on both. Figure 1 places the classes on a common chart for a 138 kV system, together with an illustrative insulation withstand line, the arrester protective level and the arrester TOV capability.
| Class | Front time | Duration | Standard test shape | Typical origin |
|---|---|---|---|---|
| Continuous | — | Indefinite | Power-frequency | Normal operation up to maximum system voltage |
| Temporary | — | Cycles to tens of seconds (or longer) | Short-duration power-frequency test | Ground faults, load rejection, Ferranti, resonance, islanding |
| Slow-front | 20–5,000 µs | Up to about 20 ms | 250/2,500 µs switching impulse | Line energization and reclosing, fault initiation and clearing, capacitor and reactor switching |
| Fast-front | 0.1–20 µs | Up to about 300 µs | 1.2/50 µs lightning impulse | Lightning, some switching of short connections |
| Very-fast-front | Under 0.1 µs | Up to about 3 ms, with oscillations above 30 kHz | No general standard shape; product-specific | Disconnect switching in gas-insulated substations, cable terminations |
The standard 1.2/50 µs lightning impulse rises to crest in 1.2 µs and falls to half value in 50 µs. The standard 250/2,500 µs switching impulse rises to crest in 250 µs and falls to half value in 2,500 µs. These are test conventions, not descriptions of every real event, but they are close enough to the real stresses to allow insulation to be rated and compared.
Two features of insulation behavior explain why the classes matter:
- Air gaps are weaker under switching impulses than under lightning impulses. For long gaps, the switching impulse CFO grows much more slowly than linearly with gap length, while the lightning CFO grows nearly linearly. At 345 kV and above, the switching surge usually sets the clearance.
- Non-self-restoring insulation (oil, paper, solid dielectrics) accumulates damage. A transformer may survive many surges below its withstand but fail after repeated stress near it. Margins for transformers are therefore deterministic and conservative, while margins for air insulation on lines are often set statistically.
How Keentel Engineering helps here. Keentel's overvoltage studies classify each case by its real wave shape, not by its cause alone. A slow switching surge on a short cable connection can behave like a fast-front event; a lightning surge entering a GIS can produce very-fast-front oscillations. We match each case to the right withstand voltage and test standard.
3. US insulation levels and the per-unit base
US equipment is specified by maximum system voltage and standard insulation levels. The table below lists common values for transmission-class equipment. It is a guide for discussion, not a substitute for the tables in IEEE C57.12.00, IEEE C62.82.1 and the switchgear standards, which should be consulted for the specific equipment.
| Nominal system voltage | Maximum system voltage | 1 pu line-to-ground crest | Common BIL choices | Common switching impulse levels (where specified) |
|---|---|---|---|---|
| 69 kV | 72.5 kV | 59 kV | 350 kV | — |
| 115 kV | 121 kV | 99 kV | 450, 550 kV | — |
| 138 kV | 145 kV | 118 kV | 550, 650 kV | About 0.83 × BIL for transformers |
| 230 kV | 242 kV | 198 kV | 750, 825, 900, 1,050 kV | About 0.83 × BIL for transformers |
| 345 kV | 362 kV | 296 kV | 1,050, 1,175, 1,300 kV | 825 to 1,050 kV |
| 500 kV | 550 kV | 449 kV | 1,425, 1,550, 1,675, 1,800 kV | 1,175 to 1,425 kV |
| 765 kV | 800 kV | 653 kV | 1,800, 1,925, 2,050 kV | 1,300 to 1,550 kV |
The 1 pu crest is the maximum line-to-ground crest voltage:
For a 500 kV system with a 550 kV maximum, 1 pu is 449 kV crest. Switching surge results are reported on this base. TOV results are usually reported as RMS values on the maximum line-to-ground RMS voltage (for example 83.7 kV for a 138 kV system with a 145 kV maximum) or on the nominal line-to-ground voltage. The base must be stated: a 1.35 pu ground-fault TOV is 113 kV on the 145 kV base but 108 kV on the 138 kV base, and that 5% difference can decide an arrester rating.
How Keentel Engineering helps here. Keentel states every overvoltage result with its base and duration, and reconciles transmission provider, equipment supplier and owner conventions before arresters and equipment are purchased. Many arrester misapplications we review trace back to a per-unit base that changed between the study and the specification.
4. Ground-fault TOV and the coefficient of grounding
Most transmission faults are single-line-to-ground (SLG). During an SLG fault on phase A, the voltages on phases B and C rise by an amount set by the ratio of zero-sequence to positive-sequence impedance at the fault. With Z1 = Z2 and a prefault voltage E, the sequence voltages at the fault point are:
and the unfaulted phase voltages are:
where a is the 120° rotation operator. The ground fault factor is the higher of |Vb| and |Vc| divided by the prefault line-to-ground voltage. The coefficient of grounding expresses the same voltage as a percentage of line-to-line voltage:
IEEE C62.92 practice treats a system as effectively grounded when X0/X1 is positive and no greater than 3 and R0/X1 is positive and no greater than 1 at every point and for every operating condition. Those limits keep COG at or below about 80%, which is the basis for applying arresters rated for effectively grounded systems.
A 230 kV substation (242 kV maximum, 139.7 kV maximum line-to-ground) has X0/X1 = 2.5 and R0/X1 = 0.4 at its bus with all ground sources in service. With the largest autotransformer out of service, the zero-sequence source weakens. Keentel calculated the ground fault factor for a range of conditions:
| X0/X1 | R0/X1 | Ground fault factor | COG | Unfaulted-phase voltage on 242 kV base |
|---|---|---|---|---|
| 1 | 0 | 1.00 | 57.7% | 139.7 kV |
| 2.5 | 0.4 | 1.25 | 72.1% | 174.4 kV |
| 3 | 1 | 1.35 | 77.8% | 188.2 kV |
| 5 | 0.5 | 1.40 | 80.8% | 195.4 kV |
| 8 | 1 | 1.50 | 86.6% | 209.6 kV |
| 20 | 2 | 1.62 | 93.7% | 226.8 kV |
| Ungrounded | — | 1.73 | 100% | 242.0 kV |
The base case is comfortably effectively grounded. With X0/X1 = 5, the bus is no longer effectively grounded, and the unfaulted phases reach about 195 kV for the duration of the fault. On a 230 kV system that is still within the TOV capability of correctly selected arresters for a few cycles, but it is not if the fault is cleared by backup protection after a second, or if the system is split so that a section is left without any ground source.
Effective grounding is a property of the operating condition, not of the system design drawing. Studies should check:
- Autotransformer and grounded-wye transformer outages. These are the zero-sequence sources of most transmission networks.
- Sequential clearing. When one end of a faulted line opens first, the remaining end may be fed from a weaker zero-sequence source.
- Single-pole switching and open conductors. An open phase changes the sequence network coupling.
- Collector systems of inverter-based plants. Inverters are generally not zero-sequence sources, and their step-up transformers are usually delta on the inverter side. If the main power transformer or a grounding transformer is out of service, or a collector feeder islands with inverters still running, the feeder can be effectively ungrounded.
- Delta-connected tertiaries and tapped transformers. These can change zero-sequence paths in ways that a simplified model misses.
The duration is set by protection. A primary clearing time of 3–5 cycles is typical at 230 kV and above. Backup clearing by remote zone 2, breaker failure or time-overcurrent elements can take 0.3 to 1.5 seconds. For impedance-grounded distribution and collector systems that are designed to ride through ground faults, the TOV can last until an operator acts. The arrester TOV check (Section 8) must use the longest credible duration.
How Keentel Engineering helps here. Keentel computes X0/X1, R0/X1 and COG at every bus and for every credible outage and switching configuration, including inverter-based plant collectors with grounding banks out of service. We tie the TOV duration to the actual primary and backup clearing times from the protection settings, so arrester ratings reflect how the system really clears faults.
5. Load rejection and the Ferranti effect
When a large load or a transmission path is suddenly lost, the generators and reactive devices that were supplying it are left with excess reactive output. Until excitation systems, plant controllers and switched devices respond, the voltage rises. For synchronous generation the rise is governed by the internal voltage behind transient reactance and the speed of the excitation system. For inverter-based plants it is governed by the reactive current the inverters continue to inject and the shunt capacitance left connected. Load-rejection TOVs of 1.1 to 1.3 pu for several seconds are common on long-line systems; higher values occur where long lines remain connected to a small island.
A long, lightly loaded line generates more reactive power in its shunt capacitance than it absorbs in its series inductance. The voltage at the open end rises above the sending-end voltage. For a lossless line, with phase constant β and length l:
At 60 Hz, β for an overhead line is close to 360 × 60 / 186,282 ≈ 0.116° per mile. The source impedance behind the sending end makes things worse, because the line's charging current flows through it and raises the sending-end voltage as well:
where E is the source internal voltage, X_S the source reactance and Z_C the line surge impedance.
A 150-mile 345 kV line has a surge impedance of about 300 Ω. Its electrical length is βl = 17.4°, and its charging is about 124 Mvar at rated voltage. Keentel calculated the sending- and receiving-end voltages after the remote breaker opens, for different source strengths:
| Three-phase fault current at sending bus | Source reactance | Sending-end voltage | Open-end voltage |
|---|---|---|---|
| 40 kA | 5.0 Ω | 1.053 pu | 1.104 pu |
| 20 kA | 10.0 Ω | 1.059 pu | 1.110 pu |
| 10 kA | 19.9 Ω | 1.070 pu | 1.121 pu |
| 5 kA | 39.8 Ω | 1.093 pu | 1.146 pu |
The line alone contributes a ratio of 1.048. A weak source adds several percent more. If the opening is a load rejection that leaves a generator connected with an internal voltage of 1.15 pu behind a 10 kA source, the open-end voltage reaches about 1.29 pu until the excitation system reduces it. That is a TOV that lasts for seconds, not cycles, and it is the value against which arresters, line-end equipment and any connected IBR must be checked.
The practical remedies are shunt reactors (line-connected or bus-connected), switching sequences that open the weak end first, voltage-dependent intertripping of line reactors, and fast excitation response. Keentel's Ferranti effect guide covers reactor sizing in detail.
How Keentel Engineering helps here. Keentel models load rejection and open-end conditions for long 230 kV to 765 kV lines and generator ties, including the source behind each end, generator excitation response and IBR reactive current. We size shunt reactors and define switching sequences so that open-end voltage stays within arrester TOV capability and equipment short-time ratings.
6. Resonance, ferroresonance and harmonic TOV
Any network with inductance and capacitance has natural frequencies. A TOV develops when a source at or near one of those frequencies excites it. The classic transmission case is a long line or cable network whose natural frequency, seen from a transformer, falls near the 2nd, 3rd, 4th or 5th harmonic. When the transformer is energized, its inrush current contains those harmonics for many cycles, and the network responds with a harmonic overvoltage that can last a second or more. The same mechanism appears in inverter-based plants with large cable networks and harmonic filters, and in black-start and system restoration scenarios where long unloaded lines are energized from small sources.
A quick screening value for the dominant parallel resonance seen from a bus with shunt capacitance Q_C and short-circuit capacity S_SC is:
Restoration plans and energization studies flag cases where h_r falls below about 5 to 6, which is where transformer inrush has significant harmonic content.
Ferroresonance is a nonlinear oscillation between a capacitance and a saturable inductance, usually a transformer magnetizing branch or a voltage transformer. Because the inductance changes with flux, the circuit can jump between stable states: a normal state and one or more ferroresonant states with high, distorted voltages and noisy transformers. The trigger is usually a switching event that leaves the transformer connected to the system through capacitance only. Typical cases include:
- single-phase switching (fuses or single-pole switches) of a lightly loaded transformer fed by cable;
- an open phase on a cable-fed collector or distribution feeder;
- voltage transformers connected line-to-ground on an ungrounded or lightly grounded system;
- breakers with grading capacitors left open with a bus voltage transformer connected;
- de-energized transmission lines coupled capacitively to a parallel energized circuit, feeding a transformer at the end.
A 3 MVA, 34.5 kV pad-mounted transformer has a magnetizing current of about 0.5% of rated current. Its equivalent magnetizing reactance is about:
The feeder cable has a capacitance of about 0.08 µF per 1,000 ft. A long-standing screening rule in distribution practice treats ferroresonance as possible when the ratio of capacitive reactance to magnetizing reactance falls within a broad band below about 40, and as likely when it falls well below that.
| Cable length | Capacitance | Capacitive reactance | Xc/Xm |
|---|---|---|---|
| 300 ft | 0.024 µF | 110,500 Ω | 1.39 |
| 1,000 ft | 0.080 µF | 33,200 Ω | 0.42 |
| 3,000 ft | 0.240 µF | 11,100 Ω | 0.14 |
| 10,000 ft | 0.800 µF | 3,300 Ω | 0.04 |
Every length in the table is inside the screening band. That is the real lesson: on cable-fed systems, almost any lightly loaded transformer is susceptible if it is switched or left with one or two phases open. The screening ratio only says the condition can occur; whether it does depends on the core characteristic, losses, load and switching sequence, and must be confirmed in an EMT study with a proper saturation model. The design response is to avoid single-phase switching of lightly loaded transformers on cable systems, to use three-pole gang-operated devices, to keep some resistive load connected during switching, to use grounded-wye primary connections where appropriate, and to add damping resistors on voltage transformer secondaries where VT ferroresonance is a risk.
How Keentel Engineering helps here. Keentel performs frequency scans and harmonic overvoltage studies for transformer energization, restoration paths and IBR cable networks, and ferroresonance studies with measured or supplier saturation curves. We recommend switching procedures, device types and damping measures, and we document them in operating instructions that field crews can follow.
7. TOV in inverter-based plants and islands
Inverter-based plants combine several features that make TOV more likely and harder to see in conventional studies:
- Large shunt capacitance. A 200 MW solar or battery plant may have 20 to 40 Mvar of collector cable charging, plus harmonic filters and capacitor banks.
- Current-controlled sources. Grid-following inverters inject a commanded current. If the grid is suddenly removed, they keep pushing current into whatever impedance remains until their own protection or control detects the change.
- Collector grounding that depends on a few devices. As Section 4 explained, the 34.5 kV collector may be effectively grounded only through the main power transformer or a grounding transformer.
- Fast control that can be mis-tuned. Reactive current that stays high after a fault clears can push voltage up, as Keentel's guide on post-fault overvoltage in weak grids describes.
A 200 MW plant has 40 Mvar of cable charging and a 15 Mvar harmonic filter, a total shunt susceptance of 0.275 pu on a 200 MVA base. Suppose the POI breaker opens and isolates the plant with little or no local load. If the inverters were to keep injecting their pre-event current of about 1.05 pu, the island voltage would settle where that current flows into the remaining admittance:
| Local load remaining in the island | Island admittance | Voltage if inverter current were held at 1.05 pu |
|---|---|---|
| None | 0.275 pu | 3.8 pu |
| 20 MW | 0.293 pu | 3.6 pu |
| 50 MW | 0.372 pu | 2.8 pu |
| 100 MW | 0.571 pu | 1.8 pu |
These are not voltages that a real plant should ever reach; inverters detect the overvoltage and the loss of the grid within a fraction of a cycle and either limit current or cease. The example shows why they must, and why the first cycle matters. Instantaneous voltages of 1.5 to 2.0 pu for a few milliseconds are credible while the inverters respond, and those few milliseconds are within the range where arresters conduct, inverter AC overvoltage protection operates and some equipment ratings are tested.
IEEE Std 1547-2018 limits the contribution of distributed energy resources to fundamental-frequency overvoltage (commonly cited as not exceeding 138% of nominal line-to-ground voltage for more than one fundamental cycle) and to instantaneous transient overvoltage. IEEE Std 2800-2022 contains corresponding requirements for transmission-connected IBRs. Designers should take the exact values, durations and measurement points from the current editions of those standards and from the transmission provider's interconnection requirements, and should confirm with the inverter supplier how the plant meets them.
| Scenario | What to check |
|---|---|
| POI breaker opening with plant at full output and at low output | Peak and RMS overvoltage at the POI, collector and inverter terminals; inverter cessation time; arrester energy |
| Collector feeder breaker opening on a ground fault with inverters running | Unfaulted-phase voltage on an ungrounded section; inverter detection; arrester TOV capability |
| Grounding transformer out of service | COG at collector buses; arrester MCOV basis |
| Transformer energization with filters connected | Harmonic resonance and harmonic TOV |
| Fault clearing with high post-fault reactive current | Post-fault voltage overshoot and duration |
| Capacitor or filter left connected after inverters trip | Sustained overvoltage until the bank is tripped |
How Keentel Engineering helps here. Keentel performs EMT overvoltage studies for solar, wind and battery plants from the inverter terminals to the POI, using vendor-specific inverter models. We check islanding, loss-of-ground-source and post-fault overvoltage against IEEE 2800 and transmission provider requirements, and coordinate inverter protection, filter and capacitor tripping, grounding design and arrester selection so that the plant's equipment and its compliance obligations are protected together.
8. Surge arresters: where TOV and transients meet
A metal-oxide arrester is a highly nonlinear resistor. At normal voltage it conducts only a small capacitive and resistive leakage current. Above its reference voltage, its current rises by orders of magnitude for a small rise in voltage, so it clamps transients to a residual voltage that depends on the discharge current and wave shape. The arrester absorbs energy during every operation and must then cool back to a stable temperature at its continuous voltage. If the heating from a TOV, or from a transient followed by TOV, exceeds what it can dissipate, it goes into thermal runaway and fails, usually short-circuiting the phase to ground.
That is why the arrester sits at the boundary of the two overvoltage families:
- TOV decides whether the arrester survives. The MCOV must exceed the continuous voltage, and the TOV capability curve must lie above the expected TOV magnitude for its full duration.
- Transients decide whether the arrester protects. Its lightning and switching protective levels, plus the voltage rise in leads and separation distance, determine the voltage that reaches the protected equipment.
- Both decide energy duty. Switching surges on long lines, capacitor bank restrikes and some lightning events dump energy into the arrester. The arrester's energy rating (in kJ per kV of rating, or by its energy class in IEEE C62.11) must cover the worst credible case.
On an effectively grounded system the MCOV must exceed the maximum continuous line-to-ground voltage:
On an impedance-grounded or ungrounded system that can carry a ground fault for a long time, the arrester must be rated for full line-to-line voltage on the unfaulted phases, so the MCOV must exceed the maximum line-to-line voltage. Raising the MCOV improves TOV survival but raises the protective level, which reduces insulation margins. The art of arrester selection is choosing the lowest rating that safely survives every credible TOV.
A 138 kV system has a 145 kV maximum, so the maximum continuous line-to-ground voltage is 83.7 kV. A station-class arrester with an 84 kV MCOV is a common choice. Arrester TOV capability varies by product and must be taken from the supplier's published curve after the specified prior energy duty. For illustration, Keentel uses capability factors of 1.40 × MCOV for 1 second and 1.30 × MCOV for 10 seconds, which gives 117.6 kV and 109.2 kV.
| TOV case | Magnitude (on 145 kV maximum line-to-ground) | Duration | TOV / MCOV | Illustrative capability for that duration | Result |
|---|---|---|---|---|---|
| Ground fault, effectively grounded (GFF 1.35), cleared by backup protection | 113.0 kV | 1 s | 1.35 | 117.6 kV | Withstands, margin about 4% |
| Load rejection, 1.15 pu | 96.3 kV | 10 s | 1.15 | 109.2 kV | Withstands |
| Ground fault with weak zero-sequence source (GFF 1.6) | 133.9 kV | 1 s | 1.59 | 117.6 kV | Fails |
The first case shows how thin the margin can be once backup clearing is considered. The third case shows what happens when a bus loses its ground source: the same arrester that is correct for normal conditions cannot survive the TOV. The options are to restore effective grounding in all credible configurations, to shorten the TOV duration (for example with faster protection or intertripping of the isolated section), or to select a higher MCOV and accept a higher protective level, then recheck the insulation margins.
If TOVs combine, for example a ground fault during a load rejection, the magnitudes do not simply add, but the combined case must be simulated and checked against the capability curve with the arrester preheated by any preceding energy duty.
Arrester energy is usually highest for:
- switching surges on long transmission lines, particularly reclosing with trapped charge without pre-insertion resistors;
- capacitor bank de-energization with a restrike;
- lightning strokes close to the arrester with high current and long tails;
- ground-fault TOV in combination with a switching event.
The energy absorbed in a line discharge can be estimated from the prospective surge voltage, the line surge impedance and the arrester residual voltage, but long-line and capacitor cases should be confirmed in EMT simulation with the arrester's nonlinear characteristic. The arrester energy class, and in some cases parallel columns, are chosen with margin over the simulated energy.
How Keentel Engineering helps here. Keentel selects arrester MCOV, TOV capability, energy class and location for substations, lines, capacitor banks, reactors and IBR collector systems. We check every credible TOV against the supplier's capability curve with the correct prior energy, simulate arrester energy for switching and lightning cases, and confirm that the chosen rating still provides the required protective margins.
9. Lightning overvoltages and protective margin
Lightning produces overvoltages in three main ways:
- Shielding failure: a stroke bypasses the shield wires and hits a phase conductor directly.
- Backflash: a stroke hits a tower or shield wire, the tower top voltage rises with the stroke current and the tower footing resistance, and the insulator string flashes over from the tower to the phase.
- Induced overvoltage: a nearby stroke induces a voltage in the conductors. This is significant mainly on distribution lines.
For a stroke current I hitting a phase conductor of surge impedance Z, the current divides in both directions, and the resulting voltage is approximately:
The critical stroke current that will just flash over insulation with critical flashover voltage CFO is therefore:
For backflash, a simplified estimate of the insulator voltage uses the equivalent impedance seen at the tower top, formed by the footing resistance R_f in parallel with the two shield wire directions of surge impedance Z_g, reduced by a coupling factor c between the shield wire and the phase:
The probability that a stroke exceeds a given peak current is commonly represented by the expression used in IEEE Std 1243 and Std 1410:
with i in kA. These simplified formulas are for screening and teaching. Line design uses IEEE Std 1243 methods or EMT simulation that includes tower surge impedance, the travel times along the tower, the nonlinear footing behavior under high current, the power-frequency voltage on the phase at the instant of the stroke and the actual insulation volt-time characteristic.
A 138 kV line has a phase conductor surge impedance of about 400 Ω and an insulator CFO of about 750 kV. The shield wire surge impedance is about 500 Ω and the coupling factor about 0.25.
Shielding failure. A 20 kA stroke to a phase produces about 400 × 20 / 2 = 4,000 kV, far above the CFO. The critical current is 2 × 750 / 400 = 3.75 kA. Almost any stroke that reaches a phase will flash it over, which is why shielding design focuses on making sure strokes large enough to matter cannot reach the phases.
Backflash.
| Tower footing resistance | Equivalent impedance | Critical stroke current | Share of strokes exceeding it |
|---|---|---|---|
| 10 Ω | 9.6 Ω | about 104 kA | about 4% |
| 25 Ω | 22.7 Ω | about 44 kA | about 29% |
| 50 Ω | 41.7 Ω | about 24 kA | about 66% |
| 100 Ω | 71.4 Ω | about 14 kA | about 89% |
The trend is the important result. Footing resistance is the most powerful lever on backflash performance; counterpoise, ground rods and line arresters are the usual tools where soil resistivity is high.
An arrester limits the voltage at its own terminals. Equipment some distance away sees a higher voltage, because a surge travelling past the arrester reflects at the equipment (which looks like an open circuit to a fast front) and adds to itself before the arrester's clamping effect returns. A common simplified estimate for a surge with rate of rise S, a separation distance ℓ and a propagation velocity v (about 300 m/µs, or about 1,000 ft/µs, in air) is:
Lead inductance between the line, the arrester and ground adds a further L·di/dt term. The lightning protective margin is then:
IEEE C62.22 recommends protective margins of at least 20% for lightning and at least 15% for switching impulses, with additional margin for chopped-wave withstand at short times.
An 84 kV MCOV station arrester has a lightning protective level of about 270 kV (illustrative; take the actual value at the coordination current from the supplier). The incoming surge has a steepness of 1,000 kV/µs. The arrester is 15 m (about 50 ft) from the transformer bushing, and the arrester leads add about 60 kV (1 µH per meter over 6 m, at 10 kA/µs).
| Transformer BIL | Voltage at transformer | Lightning protective margin | Margin if arrester were at the bushing | Maximum separation for 20% margin |
|---|---|---|---|---|
| 550 kV | 430 kV | 28% | 104% | about 19 m (63 ft) |
| 650 kV | 430 kV | 51% | 141% | about 32 m (104 ft) |
The separation term (100 kV here) is larger than the lead term and comparable to a third of the arrester protective level. That is why arresters are mounted on or very close to transformer tanks and why short, direct ground leads matter. For switching surges, with a switching protective level of about 220 kV and a BSL of about 0.83 × BIL, the margins are above 100% at 138 kV. At 345 kV and above, switching margins are much tighter and become the governing check.
How Keentel Engineering helps here. Keentel performs shielding design to IEEE Std 998 for substations, lightning performance studies to IEEE Std 1243 for transmission lines, and insulation coordination studies that compute voltages at transformer, breaker, GIS and cable terminals, not only at the arrester. We recommend arrester locations, footing resistance targets and line arrester placement where line outage rates matter.
10. Switching overvoltages: line energization and reclosing
When a breaker closes onto an open-ended line, a voltage wave equal to the instantaneous source voltage travels along the line and reflects at the open end, where it doubles. If the source voltage is at its peak at the instant of closing, the open-end voltage approaches 2 pu, and source inductance, line losses and the timing of the three poles change the result. If the line still carries trapped charge of opposite polarity from a recent opening, as can happen with high-speed reclosing, the voltage step is up to 2 pu and the reflected open-end voltage can approach 3 pu.
Figure 2 shows both families side by side. Panel (a) is a TOV: the unfaulted phase rises to about 1.35 pu during a ground fault and then to about 1.12 pu after clearing and load rejection, at power frequency, for cycles to seconds. Panel (b) is a slow-front switching transient: a simple lumped-parameter simulation of energizing a 150-mile 500 kV line at the voltage peak, with and without a 400 Ω pre-insertion resistor.
The simplified model has little damping, so its 2.4 pu peak is higher than a detailed frequency-dependent study of a single closing at peak would usually show. The point is the comparison: the pre-insertion resistor first sends a much smaller wave down the line (the resistor and the line surge impedance form a divider), and the second transient when the resistor is shorted is small because the line is already charged close to the source voltage.
The three poles of a breaker never close at exactly the same instant, and the point on the voltage wave at which each pole closes is random. The resulting overvoltage is therefore a random variable. Statistical switching studies simulate hundreds of closings with random closing times and pole scatter, then fit a distribution to the highest phase-to-ground crest of each run. The statistical switching overvoltage E2, with a 2% probability of being exceeded, is the usual design value.
| Condition on a long EHV line | Typical E2 range (pu) |
|---|---|
| Energization, no mitigation | 2.0 – 2.5 |
| High-speed reclosing with trapped charge, no mitigation | 2.5 – 3.0+ |
| Energization or reclosing with pre-insertion resistors | 1.5 – 2.0 |
| Controlled closing with line-end arresters | 1.4 – 1.8 |
| Line-end arresters only | Limited at line ends by the arrester; higher along the line |
These ranges are typical, not design values. The actual result depends on line length, source strength, shunt compensation, transposition, the breaker's pole scatter and the mitigation details, and must come from a study.
For a 500 kV line (550 kV maximum, 449 kV crest per unit), Keentel compared the switching overvoltage and the phase-to-tower gap it would require, using a simplified approach: required CFO equal to E2 divided by 0.85 (a statistical allowance of about three standard deviations of the insulation's strength) and the Gallet relationship for air gap CFO under switching impulses, with a gap factor of 1.2 for a conductor-to-tower window:
where S is the gap in meters.
| Mitigation | E2 | Crest | Required CFO | Approximate gap |
|---|---|---|---|---|
| None, reclosing with trapped charge | 2.8 pu | 1,257 kV | 1,479 kV | 4.6 m (14.9 ft) |
| None, energization without trapped charge | 2.2 pu | 988 kV | 1,162 kV | 3.2 m (10.5 ft) |
| Pre-insertion resistors | 1.8 pu | 808 kV | 951 kV | 2.4 m (8.0 ft) |
| Pre-insertion resistors and line arresters | 1.6 pu | 719 kV | 845 kV | 2.1 m (6.9 ft) |
| Controlled closing with arresters | 1.5 pu | 674 kV | 792 kV | 1.9 m (6.3 ft) |
The table is a simplified illustration; real line insulation design uses the statistical method in the IEEE insulation coordination guides, accounts for the number of towers exposed, altitude and wet conditions, and checks phase-to-phase gaps as well. The trend, however, is real: switching surge control is what makes compact EHV line designs possible, and it is why the mitigation choice belongs in the line design basis, not just in the breaker specification.
Switching surges are not caused only by closing. A fault on one phase induces a surge on the healthy phases through mutual coupling, and fault clearing can produce surges as the system rearranges. On long EHV lines these can be comparable to energization surges when pre-insertion resistors or controlled closing have reduced the closing surge, so they must be included in the study.
How Keentel Engineering helps here. Keentel performs statistical switching studies for 230 kV to 765 kV lines, cables and hybrid circuits, with frequency-dependent line models, breaker pole scatter, trapped charge, shunt reactors and arresters. We compare pre-insertion resistors, controlled closing and line arresters, calculate E2 and arrester energy, and provide the switching overvoltage basis for tower and station clearances.
11. Capacitor bank switching
Energizing a shunt capacitor bank from a source with inductance L_S produces an inrush current and a voltage transient. For a bank of capacitance C (per phase), energized at the voltage peak:
The bus voltage drops toward zero at the instant of closing and then overshoots, typically to 1.5 to 2.0 pu at the bank bus for an uncontrolled closing.
A 50 Mvar bank at 138 kV has a capacitive reactance of 380.9 Ω and a capacitance of 6.96 µF per phase. The source fault current is 25 kA, giving a source reactance of 3.19 Ω and an inductance of 8.45 mH.
| Quantity | Value |
|---|---|
| Rated bank current | 209 A |
| Inrush peak, isolated energization at voltage peak | about 3,230 A (about 11 times rated crest current) |
| Inrush frequency | about 656 Hz |
Back-to-back energization. If a second identical bank is energized while the first is already connected, the inrush comes mainly from the first bank through the small inductance between them. With 30 µH between banks, the inrush reaches about 38 kA at about 15.6 kHz, far above typical breaker capability. Breaker ratings for back-to-back switching in IEEE C37.06 tables are commonly in the range of about 16 to 20 kA peak at about 4.2 to 4.3 kHz; the actual rating of the specific breaker governs. To bring the inrush frequency down to about 4,250 Hz, the total inductance between the banks must be about 400 µH, so a current-limiting reactor of about 370 µH per phase is needed. With it, the inrush falls to about 10.5 kA at about 4,250 Hz. Controlled closing at voltage zero, or closing resistors or reactors, can reduce the inrush further.
When a utility bank is energized, its transient at the natural frequency of the source and bank travels into the distribution and customer system. If a customer has a low-voltage power factor correction capacitor whose own resonant frequency with its supply transformer is close to the utility transient frequency, the transient can be magnified at the customer bus, sometimes to 3 to 4 pu. Adjustable-speed drives, which have DC links with tight overvoltage limits, are the usual victims.
A useful screening quantity is the resonant harmonic of a customer bank with its transformer:
An industrial customer is supplied through a 10 MVA transformer with 8% impedance and has a 3.0 Mvar capacitor bank at 13.8 kV. Its resonant frequency with the transformer is about 387 Hz (about the 6.5th harmonic). The utility's 138 kV bank in Example 6 produces a transient at about 656 Hz.
| Customer bank size | Customer resonant frequency | Ratio to the 656 Hz utility transient | Magnification risk |
|---|---|---|---|
| 6.0 Mvar | 274 Hz | 0.42 | Low |
| 3.0 Mvar | 387 Hz | 0.59 | Moderate |
| 1.2 Mvar | 612 Hz | 0.93 | High |
The risk is greatest when the two frequencies are close, which happens here if the customer switches to a small first capacitor step. Remedies include controlled closing or synchronous switching of the utility bank, pre-insertion devices on the utility bank, converting the customer bank to a tuned harmonic filter, adding surge arresters or line reactors at drives, and coordinating capacitor switching times.
When a capacitor bank is de-energized, the capacitor is left charged at about 1 pu while the source voltage swings to the opposite polarity. Half a cycle later the voltage across the breaker contacts is about 2 pu. If the breaker restrikes, the transient can raise the capacitor voltage to about 3 pu, and multiple restrikes can escalate further. Modern breakers rated for capacitor switching are designed and tested to have a very low probability of restrike (the C37 standards define restrike performance classes), but older devices, vacuum interrupters at the edge of their capability and air-break switches remain a risk. Arresters at the bank and correct breaker class selection are the usual protection.
How Keentel Engineering helps here. Keentel performs capacitor and filter bank switching studies, including isolated and back-to-back energization, restrike, outrush into faults and voltage magnification at customer facilities. We size current-limiting reactors, specify controlled switching and breaker capacitive switching class, and coordinate with large industrial and data center customers whose drives and UPS systems are sensitive to switching transients.
12. Other switching phenomena: reactors, TRV and very-fast transients
Interrupting the small inductive current of a shunt reactor can cause current chopping and reignitions. The energy stored in the reactor at the chopping instant transfers to its stray capacitance and produces a high-frequency overvoltage across the reactor and the breaker. The usual remedies are controlled opening (to give the breaker enough arcing time), arresters across the reactor and breakers designed for reactor switching.
After a breaker interrupts current, the voltage across its contacts rises from zero toward the system recovery voltage with an oscillatory transient, the transient recovery voltage (TRV). The peak and rate of rise depend on the network on each side of the breaker. IEEE C37.011 gives application guidance and C37.04 and C37.06 give rated TRV envelopes. Cases that often exceed standard envelopes include faults just beyond a series reactor or transformer (fast rate of rise), short-line faults, capacitor and cable switching, and out-of-phase switching (Section 15). TRV studies are a standard part of applying breakers to series-compensated lines, near large current-limiting reactors and at generator and IBR step-up transformers.
Disconnect switch operation in a GIS produces many prestrikes and restrikes across a small gap in SF6 or an alternative gas. Each produces a step with a rise time of a few nanoseconds that travels through the GIS and reflects at every discontinuity. These very-fast-front transients can stress transformer windings connected directly to the GIS, secondary equipment and the enclosure itself (transient enclosure voltage). Their study requires models with very fine time steps and distributed-parameter representations of the GIS sections, and the GIS supplier's data.
How Keentel Engineering helps here. Keentel performs TRV studies for breaker applications at 69 kV to 765 kV, including series-compensated lines, reactor and transformer-limited faults and out-of-phase switching, and coordinates reactor switching and GIS very-fast transient studies with equipment suppliers so that breaker, reactor and transformer specifications reflect the real switching duty.
13. The mitigation toolbox
| Mitigation | Addresses | How it works | Practical notes |
|---|---|---|---|
| Effective grounding (transformer connections, grounding banks) | Ground-fault TOV | Keeps X0/X1 and R0/X1 low in every configuration | Check outage cases; protect grounding banks so they do not trip first |
| Fast and selective fault clearing | Ground-fault TOV duration | Shortens TOV so arresters and equipment stay within capability | Backup clearing time governs arrester check |
| Shunt reactors | Ferranti and load-rejection TOV | Absorb line charging | Line-connected reactors also help with secondary arc extinction in single-pole reclosing |
| Switching sequences and intertrips | Load-rejection and open-end TOV; islands | Avoid leaving long lines open-ended from weak sources; trip isolated sections | Coordinate with protection and operations |
| Surge arresters | Lightning and switching transients; arrester-limited TOV | Clamp transients to protective level | Must survive TOV; locate close to protected equipment |
| Pre-insertion resistors | Line energization and reclosing surges | Damp the initial travelling wave | Typically a few hundred ohms for about 8 to 12 ms; add maintenance and failure modes |
| Controlled (point-on-wave) switching | Line, capacitor, reactor and transformer switching transients; transformer inrush | Close at voltage zero for capacitors, at the optimum flux point for transformers, at minimum voltage difference for lines | Needs compensation for mechanical scatter, temperature and control voltage; typically accurate to about ±1 ms |
| Current-limiting and damping reactors | Back-to-back capacitor inrush | Increase inductance between banks | Check frequency and peak against breaker rating |
| Shield wires and footing resistance | Lightning shielding failure and backflash | Intercept strokes and lower tower top voltage | Counterpoise in high-resistivity soil |
| Line arresters | Lightning backflash, switching surges along the line | Prevent flashover at selected towers | Effective where footing resistance cannot be lowered |
| Surge capacitors | Steep fronts at rotating machines and some transformers | Slow the front of incoming surges | Common at generator terminals and large motors |
| Inverter and plant control logic | IBR post-fault and islanding TOV | Ramp reactive current down after clearing; detect islands and cease | Verify in EMT with vendor models |
Pre-insertion resistors and controlled switching are switching-transient tools. They do little for ground-fault or Ferranti TOV. Controlled switching of transformers, however, reduces inrush and therefore the harmonic TOV that inrush can excite in a resonant network, and controlled switching of shunt reactors reduces reignition overvoltages. A complete mitigation plan usually combines several measures.
How Keentel Engineering helps here. Keentel compares mitigation options on technical performance, life-cycle cost, maintenance and failure modes, not only on the peak overvoltage. We often find that a combination, for example controlled closing plus line-end arresters in place of pre-insertion resistors, gives the same overvoltage control with less maintenance, and we document the trade-offs for the owner's decision.
14. EMT study methodology for overvoltage studies
TOV can often be estimated with sequence-network and steady-state calculations, and many TOV checks need nothing more. Transients, resonance, ferroresonance and IBR behavior need electromagnetic transient (EMT) simulation in a tool such as PSCAD. The quality of an EMT overvoltage study depends far more on modeling choices than on the software.
| Component | TOV and resonance | Slow-front (switching) | Fast-front (lightning) | Very-fast-front |
|---|---|---|---|---|
| Network extent | Wide; include sources and zero-sequence paths | Several buses beyond the switched element; equivalents beyond | A few spans and the station; equivalents beyond | GIS sections only |
| Overhead lines | Pi or Bergeron models acceptable for power frequency; frequency-dependent for resonance | Frequency-dependent (phase-domain) models with transposition as built | Frequency-dependent span-by-span models near the station; tower surge impedance | Not applicable |
| Cables | Pi sections or frequency-dependent; sheath bonding as built | Frequency-dependent with sheath and armor | Frequency-dependent | Distributed models of GIS bus and terminations |
| Transformers | Saturation, core loss and winding connections | Saturation; stray capacitances | Capacitive model of the terminals | High-frequency model from the supplier |
| Breakers | Ideal switch with clearing times | Pole scatter, closing statistics, PIR insertion time, controlled-switching accuracy | — | Prestrike and restrike behavior |
| Arresters | Nonlinear V–I characteristic | Nonlinear V–I with switching characteristic | Frequency-dependent arrester model (IEEE working group type) | Supplier model |
| Inverter-based resources | Vendor-specific EMT model with plant controller | Vendor-specific model | Usually not needed | Not needed |
| Time step | 10 to 50 µs | 1 to 20 µs | 1 to 50 ns near the stroke | Below 1 ns |
1. Define the purpose and acceptance criteria. For each case, state which equipment is checked and against what: arrester TOV capability and energy, BIL and BSL with required margins, breaker TRV envelopes and capacitive switching ratings, inverter and IBR equipment ratings.
2. Build and validate the model. Check short-circuit currents against the short-circuit program, line charging and series impedance against line constants, and steady-state voltages against the power flow. Check that frequency scans show the expected resonances.
3. Run deterministic screening cases. Worst-case closing points, worst fault locations, maximum and minimum source strength.
4. Run statistical cases where required. Typically 100 to 200 or more random closings per case for switching studies, with documented pole scatter and controlled-switching accuracy; fit a distribution and report E2 with confidence.
5. Check arrester energy and insulation margins. At every protected point, not only where the arrester is.
6. Test sensitivities. Source strength, line length, shunt compensation, trapped charge, number of parallel arresters, IBR control mode.
7. Document. Model data sources, assumptions, cases, results, recommendations and the edition of each standard used, in a form a reviewer or regulator can follow.
| Error | Effect |
|---|---|
| Constant-parameter line models for switching studies | Underestimated damping or wrong frequency content; misleading peaks |
| Ignoring breaker pole scatter and trapped charge | Underestimated switching overvoltage |
| Arresters modeled as ideal clippers | Wrong energy and wrong voltage at protected equipment |
| Transformer modeled without saturation | Missed harmonic TOV and ferroresonance |
| Generic inverter models in IBR overvoltage studies | Wrong post-fault and islanding behavior |
| Results reported without per-unit base or duration | Misapplied arresters and equipment |
| Only one operating condition studied | Missed loss-of-ground-source and weak-source cases |
How Keentel Engineering helps here. Keentel's EMT team builds validated PSCAD models from line constants, cable data, transformer test reports and vendor-specific IBR models. We run deterministic and statistical overvoltage studies, document every assumption, and deliver results that utilities, transmission providers and equipment suppliers can review and accept.
15. Overvoltages, out-of-step tripping and NERC PRC-026
NERC Reliability Standard PRC-026-1 (Relay Performance During Stable Power Swings) requires Planning Coordinators to identify Elements at risk from power swings, and Generator Owners and Transmission Owners to evaluate their load-responsive protective relays on those Elements against the Attachment B criteria, so that they are expected not to trip for stable swings. Where a relay does not meet the criteria, the owner must develop and implement a Corrective Action Plan, while keeping dependable fault detection and dependable out-of-step tripping where out-of-step tripping is applied.
Every one of those decisions affects overvoltage:
- Out-of-step tripping chooses when breakers open during an unstable swing. The voltage across an open breaker's contacts depends on the angle between the two systems at the instant of opening.
- Out-of-step tripping chooses where the system separates. The islands it creates may have a large surplus or deficit of generation and reactive power, and a surplus produces load-rejection TOV in the island.
- Corrective actions under PRC-026 change relay behavior. Converting a mho characteristic to a quadrilateral, adding power swing blocking or reducing reach changes how and when lines trip during swings, which changes the switching events the system will experience.
For two equal sources of magnitude E separated by an angle δ, the power-frequency voltage across the open contacts is:
| Separation angle at opening | Voltage across contacts (1.0 pu sources) | With 1.05 pu sources | Crest across a 345 kV breaker (1.0 pu sources, 362 kV maximum) |
|---|---|---|---|
| 60° | 1.00 pu | 1.05 pu | 296 kV |
| 90° | 1.41 pu | 1.48 pu | 418 kV |
| 120° | 1.73 pu | 1.82 pu | 512 kV |
| 150° | 1.93 pu | 2.03 pu | 571 kV |
| 180° | 2.00 pu | 2.10 pu | 591 kV |
The transient recovery voltage adds an oscillatory overshoot on top of this power-frequency recovery voltage. IEEE C37 breaker standards define an out-of-phase switching rating at a reduced current (commonly 25% of rated short-circuit current) with an out-of-phase recovery voltage factor commonly stated as 2.0 pu for effectively grounded systems and 2.5 pu for non-effectively grounded systems, and specific TRV parameters. Not every breaker is rated or tested for out-of-phase switching at full system voltage, and ratings should be confirmed from the current C37.04 and C37.06 editions and the breaker's nameplate and test reports.
Two practical consequences follow:
- Trip-on-the-way-in versus trip-on-the-way-out. Tripping as soon as the swing is judged unstable (on the way in) separates the system sooner, but the breaker may open as the angle approaches 180°. Tripping on the way out waits until the impedance trajectory has passed through the line and the angle is moving away from 180°, so the breaker opens with less voltage across its contacts. Keentel's power swing guide works through the timing in detail. The choice must be made with the breaker's out-of-phase capability in hand.
- Arresters and line-end equipment. An out-of-phase opening on a long line can be followed by open-end and load-rejection TOV in the separated systems. The arrester TOV check should include the separation scenarios defined in the out-of-step philosophy.
When out-of-step tripping separates a system, each island must survive on its own. An island with surplus generation sees frequency rise and, if it also has surplus reactive power from long lines and capacitors, a voltage rise. In regions with high inverter-based resource penetration, the island may contain IBR plants whose behavior after the separation depends on their ride-through settings and controls. The island's TOV must stay within:
- arrester TOV capability and transformer overexcitation limits;
- the voltage ride-through capability required of generators under NERC PRC-024 (for synchronous generation and certain wind types) and PRC-029 (for inverter-based resources), so that generators do not trip unnecessarily and worsen the island's balance;
- IBR equipment ratings and IEEE 2800 overvoltage limits.
The planning studies that justify an out-of-step tripping location under TPL-001 and the UFLS island assessments should therefore check island voltage as well as frequency. That evidence also supports the Planning Coordinator's PRC-026 R1 work, which considers Elements forming island boundaries in UFLS assessments where islands form through angular instability.
| Service | What Keentel delivers | How it links to overvoltage |
|---|---|---|
| R1 support for Planning Coordinators | Screening of planning dynamics results for swing-related relay tripping; Element identification under the R1 criteria; annual notifications | Separation and island cases are checked for island voltage and arrester TOV |
| R2 relay evaluations | Attachment B evaluation of every load-responsive element (phase distance, phase overcurrent, out-of-step, loss-of-field) on each identified Element, with plots and calculations | Out-of-step elements are evaluated together with breaker out-of-phase capability |
| Event-driven evaluations | Analysis of trips to determine whether a stable or unstable swing was involved, within the R2 timeline | Event records reviewed for recovery voltage and arrester operations |
| R3 Corrective Action Plans | Options such as quadrilateral conversion, lens shaping, power swing blocking supervision and reach changes, with fault coverage, PRC-023 loadability and coordination checks | Changes in tripping behavior are screened for new switching and island scenarios |
| R4 implementation support | Settings files, test plans, field support and closeout | Commissioning tests include out-of-step logic and trip timing |
| Out-of-step philosophy and breaker duty | Separation locations, trip-on-the-way-in or way-out decisions, coordination with generator out-of-step relays | TRV and out-of-phase recovery voltage checked against breaker ratings |
| Audit preparation | RSAW-ready evidence, mock audits, dated records against the 12-month and six-month clocks | Study files referenced in the evidence index |
The details of PRC-026 summarized here should be confirmed against the current version of the standard and its effective dates on NERC's website. Keentel's power swing blocking and PRC-026 guide covers the Attachment B screening method, the requirement timelines and common findings in more depth.
How Keentel Engineering helps here. Keentel connects PRC-026 compliance with breaker duty and overvoltage studies. When we evaluate an out-of-step tripping scheme, we also check the breaker's out-of-phase capability, the TRV at the expected opening angles and the TOV in the islands the scheme creates, so that the compliance evidence and the equipment design tell the same story.
16. Where overvoltage requirements appear in US standards and processes
| Requirement source | Overvoltage relevance |
|---|---|
| NERC TPL-001 | Planning events and extreme events, including fault clearing times and stability; supports out-of-step tripping and island design |
| NERC PRC-024 and PRC-029 | Voltage ride-through for generators and IBRs, including high-voltage ride-through that must be coordinated with TOV |
| NERC PRC-026 | Relay behavior during power swings; out-of-step tripping decisions that set breaker opening angle |
| NERC PRC-023 | Transmission relay loadability; constrains corrective actions that change relay reach |
| NERC FAC-001 and FAC-002 | Facility interconnection requirements and studies, where transmission providers specify overvoltage, grounding and insulation requirements |
| IEEE 2800 and IEEE 1547 | IBR and DER limits on temporary and transient overvoltage contributions |
| NESC (ANSI C2) | Clearances for overhead lines and substations; alternate clearance methods for voltages above 98 kV ac based on known maximum switching-surge factors |
| NEC (NFPA 70) | Surge arrester and surge protective device requirements for premises wiring systems, including medium-voltage installations within its scope |
| IEEE C62 series | Insulation coordination principles, arrester application and testing, neutral grounding |
| IEEE C57 and C37 series | Transformer insulation and overexcitation; breaker TRV, capacitive switching and out-of-phase ratings |
| Transmission provider interconnection requirements | Grounding, arrester and insulation requirements at the point of interconnection; study requirements for IBR plants |
How Keentel Engineering helps here. Keentel maps each project's overvoltage requirements across NERC standards, IEEE equipment standards, the NESC and the transmission provider's interconnection requirements, so that the design, the studies and the compliance evidence are consistent from the start.
17. Practical checklist
- State the per-unit base and duration for every overvoltage result.
- Confirm effective grounding at every bus for every credible outage and switching configuration, including IBR collectors with grounding banks out of service.
- Use the longest credible fault clearing time, including backup clearing, for ground-fault TOV.
- Check load rejection and open-end voltage on long lines and generator ties with realistic source strength and excitation or IBR control response.
- Screen for resonance and ferroresonance wherever cables, filters or capacitor banks meet lightly loaded transformers.
- Select arrester MCOV from the TOV study, then check protective margins; do not select arrester ratings from a table alone.
- Calculate voltage at the protected equipment, including separation distance and lead length.
- Run statistical switching studies for lines at 230 kV and above, and for any line where switching surges might govern clearances.
- Check capacitor bank inrush, back-to-back switching, restrike class and voltage magnification at nearby customers.
- Check breaker TRV and out-of-phase capability where out-of-step tripping is applied, and coordinate with the PRC-026 evaluation.
- Include island voltage in out-of-step separation and UFLS island studies.
- Use vendor-specific EMT models for inverter-based resources.
- Document data sources, models, cases, results and standard editions.
Part C — Three Anonymous US Case Studies
The following case studies are composites based on the types of problems Keentel Engineering is asked to solve. Names, locations and some values have been changed or simplified to protect client confidentiality.
Case Study 1 — A 345 kV line where pre-insertion resistors were being retired
Situation. A Midwestern transmission owner planned to replace aging 345 kV breakers on a 120-mile line. The original breakers had pre-insertion resistors, and the owner's maintenance group had experienced several resistor failures over the years. The replacement breakers were available without resistors and with optional controlled closing. The owner asked whether the line insulation, which had been designed decades earlier around a switching overvoltage basis that assumed resistors, would remain adequate.
What Keentel did. Keentel built a PSCAD model of the line and the adjacent 345 kV network with frequency-dependent line models, the line's shunt reactors, the existing station arresters and the actual breaker pole scatter from the supplier's data. We ran statistical energization and high-speed reclosing studies of 200 closings per case for four alternatives: existing resistors, no mitigation, controlled closing only, and controlled closing with line-end arresters. Trapped charge was represented for reclosing, including the effect of the shunt reactors, which cause the trapped charge to oscillate rather than stay constant.
Findings. Without mitigation, the reclosing E2 rose to about 2.7 pu at the open end, above the switching withstand implied by the original tower design with the required margin. Controlled closing alone brought it to about 1.9 pu. Controlled closing with line-end arresters reduced it to about 1.7 pu along most of the line, below the original resistor-based design value, with arrester energy well within a standard station-class rating. The study also showed that controlled closing accuracy had to be maintained within about ±1 ms, which required temperature and control-voltage compensation and a commissioning test.
Outcome. The owner specified breakers with controlled closing and added line-end arresters, avoided the maintenance burden of resistors and kept the existing towers. Keentel wrote the commissioning test procedure for the controlled-switching devices and an operating note covering what to do if controlled closing is unavailable.
Lessons. Removing pre-insertion resistors is a line insulation decision, not only a breaker decision. A statistical study with realistic trapped charge is needed to support it.
Case Study 2 — A 138 kV capacitor bank and an industrial customer's drives
Situation. A Southeastern utility installed a 50 Mvar, 138 kV capacitor bank to support voltage in a growing industrial area. Within weeks, a nearby manufacturing plant served at 13.8 kV reported repeated trips of its adjustable-speed drives on DC-link overvoltage. The trips correlated with the morning energization of the new bank.
What Keentel did. Keentel modeled the 138 kV system, the new bank, the customer's 10 MVA supply transformer and its stepped 13.8 kV power factor correction bank, using the customer's switching records. We found that the customer's first capacitor step, 1.2 Mvar, gave a resonant frequency with its transformer of about 610 Hz, very close to the 138 kV bank's energization transient frequency of about 650 Hz. With that step in service, the simulated transient at the customer's 13.8 kV bus reached about 2.6 pu crest, and the drive DC links saw voltages well above their trip thresholds.
Options compared. Controlled closing of the 138 kV bank, a pre-insertion inductor on the bank breaker, converting the customer's first step to a 4.7th-harmonic tuned filter, and adding AC line reactors at the drives.
Outcome. The utility retrofitted controlled closing on the bank breaker, which reduced the transient at the source. The customer, on Keentel's recommendation, converted its capacitor steps to tuned filters, which also addressed a separate harmonic distortion concern. After the changes, the simulated magnification fell below 1.3 pu and the drive trips stopped.
Lessons. Capacitor bank studies should include significant customer capacitors on the same transmission or subtransmission bus. Voltage magnification is a system problem with a solution on either side of the meter.
Case Study 3 — Arrester failures on a 34.5 kV collector at a solar and storage plant
Situation. A 200 MW solar and 100 MW battery plant in the Southwest connected to a 230 kV transmission line through a 230/34.5 kV main power transformer with a grounded-wye 34.5 kV winding. The collector system used 34.5 kV arresters rated for an effectively grounded system. After a ground fault on one collector feeder, two arresters on that feeder failed and the feeder's cable terminations were damaged.
What Keentel did. Keentel reviewed the plant's event records and modeled the collector system in PSCAD with the inverter supplier's EMT model. The fault had been cleared by the feeder breaker, which opened in about 5 cycles. However, the inverters on that feeder did not cease immediately; for about 150 ms they continued to inject current into the islanded feeder, which had no zero-sequence source once the feeder breaker opened. The unfaulted phases rose toward line-to-line voltage, about 36 kV, while the arresters had an MCOV of about 22 kV. Their TOV capability for that duration was exceeded, and they failed.
Findings. The design had assumed the collector would always be effectively grounded through the main power transformer. That assumption is false for an islanded feeder with running inverters. The study also showed that, with the plant's large cable network, the islanded feeder had a parallel resonance that distorted the voltage and delayed the inverters' overvoltage detection.
Outcome. The owner worked with the inverter supplier to shorten the inverters' islanding detection and cessation time on that condition, added a feeder-level grounding transformer on the longest feeders, and replaced the arresters with higher-MCOV units on feeders where the TOV could not be bounded. Keentel updated the plant's insulation coordination study, the arrester specification and the protection settings so that the feeder grounding transformers are not tripped before the feeder breaker. The plant's PRC-024 and PRC-029 ride-through settings were rechecked to confirm the changes did not reduce ride-through capability for grid faults.
Lessons. IBR collector overvoltage design must consider islanded feeders, not just the steady-state grounding of the main transformer. Arrester rating, grounding design and inverter islanding behavior are one design problem.


















